Quick answer

What does a secure IT office relocation involve?

A secure IT office relocation is the tracked move of IT equipment between sites with chain of custody maintained throughout. Assets are RFID-tagged and GPS-tracked in transit, handovers are signed, and you receive a reconciled inventory confirming everything that left one site arrived at the next.

Secure Office Relocation

Move your office. Keep your operations live.

RFID-tagged inventory, GPS-tracked transit, the same SIA-trained crew end to end, and a port-by-port verification report on handover. Most floors back online inside 24 hours.

ISO 27001 CertifiedGPS-Tracked TransitChain of Custody24h Return-to-Service
Your Move Documentation
Audit-ready

Every relocation ends with a complete pack you can hand to compliance, finance and your auditors without an extra meeting.

RFID Asset Inventory

Every device tagged, photographed and reconciled at origin and destination

Chain-of-Custody Log

Signed at every checkpoint from packing to recommission

Connectivity Verification Report

Port-by-port test results signed off before handover

Disposal Audit Pack

For any equipment retired during the move, fully GDPR defensible

Download a sample handover pack

Why UK and multinational businesses choose us

A relocation partner you can trust with the keys

ISO 27001 Certified

Information security throughout the move: your assets and data stay protected from desk to desk.

GPS-Tracked, Unmarked Vehicles

Every vehicle is unmarked, alarmed and live-tracked. No painted livery to draw attention to high-value cargo.

SIA-Trained, DBS-Vetted Crews

The same uniformed crew handles your assets from start to finish, never sub-contracted out.

Same-Day Return to Service

Most floors are fully recommissioned, tested and back online within 24 hours of vehicle arrival.

Move Types

One playbook, three move shapes

Whether you're moving one address, sequencing across floors, consolidating UK sites or coordinating a UK / EU HQ relocation, we run it with the same project manager, same crew, and the same documentation pack.

Most Common

Single-Site Relocation

Door to door

Move your full IT and office estate from one address to another in a single coordinated operation. Pre-stage, decommission, transit and recommission with one project manager from start to finish.

  • Site survey at both addresses
  • Out-of-hours / weekend window
  • One PM, one crew, one number to call
Phased

Phased Multi-Floor Move

Zero-downtime

Critical operations stay live while teams relocate floor-by-floor. We sequence packing, transit and recommission so each department is back online before the next is taken offline.

  • Department-by-department sequencing
  • Hot-swap and pre-staged kit
  • Detailed cutover schedule
Consolidation

Multi-Site Consolidation

Hub model

Closing satellite offices and consolidating into a regional or HQ hub. We collect from every site on a coordinated schedule, decommission what is not moving, and recommission at the destination.

  • UK-wide collections in one programme · UK / EU consolidations on request
  • Decommission and remarket retired kit
  • One consolidated audit pack
Our Process

Six phases. One seamless relocation.

From the survey to the verification sign-off, every phase is owned by the same project manager and tracked end to end.

01
Phase 01

Survey & Plan

Site walks at both addresses, asset inventory, network and power audit, risk register and detailed cutover plan.

02
Phase 02

Pre-Stage & Prep

Pre-built workstations, cable kits and signage prepared offsite to compress the live move window.

03
Phase 03

Decommission & Pack

Professional disconnect, RFID tag, anti-static pack and seal: one workstation per crate.

04
Phase 04

Tracked Transit

Loaded under CCTV, sealed, GPS-tracked to destination with live status updates to your project sponsor.

05
Phase 05

Recommission & Test

Rack, stack, cable, deploy. Every port and workstation tested before sign-off.

06
Phase 06

Handover Pack

Inventory reconciliation, chain-of-custody log and verification report signed off and delivered.

Choose your move shape

Single-site, phased or consolidation?

A quick comparison of which programme suits your scenario. We'll confirm in the free site survey.

 Single-SitePhasedConsolidation
Same crew end-to-end
GPS-tracked unmarked vehicles
Out-of-hours / weekend window
Critical apps stay live during move
Best for sites with > 200 staff
Includes ITAD for retired kit
Multi-site UK collection
What's Included

Six things every Nanosoft move ships with

Pre-Move Site Survey

Detailed origin and destination survey covering power, networking, access, lift booking and out-of-hours permissions.

RFID Asset Tagging

Every monitor, dock, laptop, switch and rack-mount asset is RFID-tagged at packing and reconciled on arrival.

Anti-Static Crated Packing

Foam-lined wheeled crates, anti-static bags for components, cable-bagging per workstation, tamper-evident seals.

Tracked Secure Transit

Unmarked, alarmed, GPS-tracked vehicles. Vetted SIA-trained drivers and dedicated security on high-value loads.

Rack & Stack Recommission

Network and rack equipment installed, cabled and brought online to your topology, with no third-party hand-offs.

Workstation Recommission

Desks set out to your floor plan, every workstation rebuilt, cable-managed and connectivity-tested before handover.

Inside the Move

From your old desk to your new one

Tag, pack, seal

Tag, pack, seal

RFID asset tagging and anti-static crating at origin

GPS-tracked transit

GPS-tracked transit

Unmarked, alarmed vehicles with live status updates

Recommission and test

Recommission and test

Workstations rebuilt, port-tested and signed off

Industries We Serve

Trusted relocation partner across regulated UK industries

From a 30-person fintech HQ move to a multi-trust NHS consolidation, and from UK office cycles to UK-coordinated EU HQ relocations: same playbook, same crew, same paperwork.

Financial Services

Banks and insurers needing watertight chain-of-custody during HQ moves and merger consolidations.

Out-of-hours windowSIA-vetted crewsPer-device audit

Healthcare & NHS

Trusts and clinics moving patient-data-bearing endpoints with NHS DSPT-aligned reporting.

DSPT-alignedTamper-evident transitSame-day return to service

Education

Universities and MATs reorganising campuses, computer suites and labs without losing a teaching day.

Holiday-window movesLab equipment specialistsBulk workstation recommission

Corporate & Public Sector

Multi-floor HQ moves, council relocations and government estate rationalisations.

UK + UK-coordinated EU logisticsPhased cutover plansSingle PM contact
FAQs

Frequently Asked Questions

Planning a move? Let's walk the building.

Free site survey at your origin and destination, a phased plan with risk register, and a fixed quote. No obligation.

UK delivery · UK-coordinated EU HQ moves · ISO 27001 certified